How often to update an evacuation diagram in Victoria
An evacuation diagram is a picture of one building on one date. It goes out of date when the building changes, not because a calendar app sends a reminder. In Victoria the useful question is: does this sheet still show the exits, the route, the fire equipment and the assembly point a person would use today?
This is when to redraw, and when a drill or a rehearsal is only a check. It is not a certification schedule. Diagrams we draw are prepared to suit AS 3745 layout guidance. We do not provide AS 3745 certification, and we do not nominate the validity date. You or your fire safety adviser do that. The order page is fire evacuation plans. What the sheet is for is in what a fire evacuation diagram is.
Redraw when the building changes
Replace the diagram if any of these are true:
- A fit-out moved a wall, a counter, a racking run or a door
- An exit was blocked, locked after hours, or is no longer the way out
- A new exit was added
- Extinguishers, hose reels or a blanket moved, or a new one was installed
- The assembly point changed, or the old one is now a loading bay
- A mezzanine or another floor is now occupied
- A new tenant is using the floor, and the old sheet shows the previous layout
- The procedure text on the sheet is no longer the procedure staff are trained on
A faded print of a correct diagram is a reprint, not a redraw. A correct diagram of a building that has since been altered is a new drawing. Send the current plan. If the only plan is the one from before the fit-out, start with a site measurement. The visit has a call-out fee. We do not publish the amount.
The handover version of this, when a lease or a fit-out is the reason the old sheet is wrong, is in evacuation diagram for a lease or fit-out handover.
The date on the sheet
The sheet should show the address and the date it was drawn, so the next person can see which building it belongs to and how old it is. Some fire safety advisers also want a validity date printed on it.
FPA Australia's public bulletin on evacuation diagrams says the emergency planning committee nominates the validity period, that the period should not exceed five years and may be shorter, and that the validity date is shown on the sheet. That bulletin is industry guidance about AS 3745. It is not a WorkSafe direction to your premises, and it is not something we decide. If your adviser or emergency planning committee has nominated a date, send it and we print it. If they have not, we date the sheet with the day it was drawn and leave the validity date for them to confirm. We do not certify that the diagram meets AS 3745.
The bulletin is FPA Australia, Evacuation Diagrams.
A drill is a check
WorkSafe Victoria's office health and safety guidance names AS 3745-2010 and notes that the standard recommends an emergency evacuation drill at least annually. Use that drill to look at the sheet on the wall: are the exits still exits, is the assembly point still the one the wardens used, is the "you are here" marker still beside the sign?
If the answer is yes, you do not need a new drawing because a year passed. If the answer is no, the drill has done its job and the diagram needs a redraw before the next one.
Childcare is a shorter rehearsal, not a shorter drawing life
Early childhood services in Victoria rehearse emergency and evacuation procedures every three months and keep a record. The regulator also says to check the assembly point is still suitable each time you rehearse, and to review arrangements after the drill. The page is Emergency management in early childhood services.
That three-month clock is the rehearsal. Redraw the diagram when the rehearsal, or a change to the rooms, shows that the floor, the routes, the exits, the equipment or the assembly point on the sheet are wrong. A service that has not moved a wall does not need a new CAD file four times a year. What is different about the childcare sheet itself is in evacuation diagrams for childcare, clinics and warehouses.
What a redraw costs
A redraw is the same published fee as a new diagram, because it is a new drawing of the current floor.
- One floor, including the you-are-here points you list: $89
- Each additional floor: $29
- DWG, PDF and print-ready PDF: included
- 6 hours once we can draw from a usable plan of the building as it is now
There is no separate artwork fee. A floor that has changed is drawn at the same fee as a new floor. If the only change is a spelling fix on a sheet we drew, and the building is unchanged, tell us before we start. A site visit, if the current layout was never drawn, is a call-out. The amount is not published. It is in the quote before anyone is booked.
How the six hours start, and the full send list, is in how to get an evacuation diagram in 6 hours for $89. For an update, the extra fact that matters is what changed: "the rear door is now a window" is more useful than resending the old diagram alone.
A redraw of one floor is $89. Each extra floor is $29. Files come back in 6 hours when the current plan is usable.
Upload Your Plans & Get a Quote in 24 Hours
Professional drafting for builders and renovators across Australia. Fixed pricing, fast turnaround.
