Evacuation diagrams for childcare, medical clinics and warehouses in Victoria
A childcare room, a GP clinic and a warehouse can all be asked for an "evacuation plan". The product is the same kind of sheet: a floor people can read on the wall. The brief is not the same. A diagram that would be fine in a small office can be wrong in all three of these buildings, because the people leaving, the exits that count, and the words on the sheet are different.
This note is those three briefs. It does not decide whether your site must display a diagram. The general question, and what the sheet is not, is in what a fire evacuation diagram is. The symbols themselves are in what goes on an evacuation plan. Order the drawing on fire evacuation plans.
One floor is $89. Each extra floor is $29. The files come back in 6 hours when we can draw from a usable plan or from clear photos. You receive a DWG, a PDF and a print-ready PDF. Diagrams are prepared to suit AS 3745 layout guidance. We do not certify them, and we do not approve the emergency procedures. You, or your fire safety adviser, confirm those words.
Childcare, kindergarten and OSHC
Victorian early childhood services have a clearer public rule than a typical shop. Victoria's early childhood regulator says approved providers must display an emergency and evacuation floor plan and instructions near each exit, rehearse the procedures every three months, and keep a record of the rehearsal. The page is Emergency management in early childhood services. It covers long day care, standalone kindergarten, family day care, outside school hours care, occasional care and limited hours care.
The same page says the diagram must include:
- A floor plan of the service
- The evacuation routes
- The assembly areas
- The location of emergency equipment, such as fire extinguishers
Check the assembly point is still suitable each time you rehearse. Where you can, nominate more than one, and prefer a place with toilets, shelter and water. We draw the points you nominate. We do not pick a park across a road and call it the assembly area.
A few things change the drawing:
- Family day care is that residence or venue, not a generic centre plan. Each home needs its own floor.
- A service on a school site still keeps its own risk assessment and its own emergency contacts. We draw the rooms the service uses, with the exits and assembly point the provider nominates. We do not relabel the school's diagram unless that sheet is actually the service's plan.
- An upper floor with cots, sleep rooms or children who are not walking needs the routes the provider has already decided, including how those children leave. That text belongs to the provider's procedures. We set it out on the sheet. We do not write the emergency management plan.
- Posting. The regulator's requirement list says the floor plan and instructions go near each exit. Tell us which exits, so each copy has the right "you are here" marker. Those locations on the one floor are part of the $89. Another storey is $29.
The three-month rehearsal is a practice of the procedure. It is not, by itself, an instruction to redraw the diagram if the building has not changed. Redraw when the rehearsal shows the sheet is wrong. That timing is in how often to update an evacuation diagram.
Medical clinics
A GP clinic, dental surgery, physio room or allied-health tenancy in Melbourne is a workplace. Visitors and patients do not know which door is the staff exit, and some of them cannot walk out unaided. WorkSafe Victoria's office health and safety guidance is the public starting point for employer emergency planning. It names AS 3745-2010. It is not a ruling that every clinic must display a diagram. Check the request you were sent.
What we need, beyond a normal office:
- The public entry and any staff or after-hours door, and which of them are the designated exits
- Treatment, consult and imaging rooms labelled as people know them, so a route through "room 3" is readable
- Where reception will post a diagram, and any second posting point by a rear door
- The assembly point, in words if it is "the car park beside the lane, clear of the driveway"
- Fire equipment you confirm is installed. If there is oxygen or another medical gas the staff need shown, say so. We do not add it because a clinic "usually" has it
- The procedure text staff already use, including how a patient in a treatment room is helped out. You or your adviser confirm that text
A hospital, a day procedure centre or an aged care home may be asked for a fire engineering report or a building surveyor's document rather than a wall diagram. Send the request. If a wall sheet is the wrong document, we will say so before we draw.
An NDIS diagram for a Specialist Disability Accommodation or Supported Independent Living home is a different service: NDIS evacuation plans. A clinic is not that brief.
Warehouses and factories
On a warehouse floor the useful information is the path between the racking, not a rectangle with a green arrow at the front door. Tell us which doors are the designated exits. A roller shutter or a loading dock is often not one of them. If it is, say so. If it is blocked by goods or only used by trucks, do not leave it on the sheet as a way out.
The assembly point has to be off the truck path and far enough from the building that people are not standing in the driveway the fire service will use. "The yard" is not enough if the yard has three corners.
A mezzanine office, or a first-floor amenities block that people occupy, is another floor. The ground floor is $89. The mezzanine is $29. Send both levels at the start.
Racking that moves, a new cool room, or a door that was sheeted over in a fit-out makes the old diagram wrong. That is a redraw, not a sticker. If the only plan is an empty shell from the lease, or the racking was never drawn, the first step is a site measurement. The visit has a call-out fee. We do not publish the amount. A large or services-heavy building can be laser scanned. We do not publish a scan price. The quote names the method.
What to send for these three
The fee and the six-hour clock are the same as any other workplace diagram. How that clock starts is in how to get an evacuation diagram in 6 hours for $89. For these buildings, add the facts that make the sheet specific:
- Which kind of building it is, and the address
- The floors people occupy, including a mezzanine
- A plan or photos that show the exits you actually use
- Where each copy will be posted
- The assembly point, and a second one if the provider uses one
- The procedure text, if it has already been written
- For childcare, the exits the diagram must sit near, and whether children are on an upper floor
- For a clinic, the staff exit and any equipment you want named
- For a warehouse, which doors are exits and which are docks
Use the quote form on fire evacuation plans and choose Fire Evacuation Plan. If the request is actually a liquor licence, that is a different drawing: a standard liquor redline is $499 flat, in 48 hours, as DWG and PDF, when usable plans already exist, on redline plans. The difference is in evacuation diagrams vs redline plans.
One floor is $89 and each extra floor is $29, delivered in 6 hours when a usable floor plan exists. DWG, PDF and a print-ready PDF.
Upload Your Plans & Get a Quote in 24 Hours
Professional drafting for builders and renovators across Australia. Fixed pricing, fast turnaround.
