★★★★★ 5.0 on Google · 7 reviews200+ Projects Delivered Across VIC24-Hour Quote TurnaroundFixed Pricing · No Surprises★★★★★ 5.0 on Google · 7 reviews200+ Projects Delivered Across VIC24-Hour Quote TurnaroundFixed Pricing · No Surprises
Back to BlogGuides

What Is a Fire Evacuation Diagram and Does Your Business Need One? (Victoria)

10 November 2026 8 min read

A fire evacuation diagram is a plan of how people get out of a building. It is drawn over the floor, with the exits, the way to those exits, the fire equipment, an assembly point and a "you are here" marker, and it is made to be printed and put on a wall. In Victoria it is often called an evacuation diagram, an evacuation plan, or a fire evacuation plan. Those names usually mean this sheet. They do not mean a building permit set, and they do not mean the red line on a liquor licence.

This note is for offices, shops, warehouses, cafes, childcare, strata and factories. It is not a decision that your workplace must display a diagram. WorkSafe Victoria, your council, your building surveyor, or the person who wrote your lease may each ask for something different. Check the request you were actually sent.

What the diagram is

The diagram is a simplified floor of one level. Someone standing in front of it should be able to see where they are, which way the exits are, and where people are meant to gather outside. It is a communication sheet. It is not a construction drawing, and it is not a certificate.

On fire evacuation plans the sheet includes:

  • The floor plan of that level
  • The exits, and the routes to them
  • Fire equipment you confirm is installed, such as extinguishers and hose reels
  • The assembly point
  • A "you are here" marker for the places you will post it
  • A short emergency procedures block, and a legend that matches the symbols

You receive a DWG, a PDF and a print-ready PDF. Arya supplies the DWG and the PDF on every drawing. The print-ready PDF is the file for the wall. One floor is $89. Each additional floor is $29. The drawing is delivered in 6 hours when we can work from a usable floor plan or from clear photos. There are no hidden charges on that drawing.

What each of those symbols is doing is covered in what goes on an evacuation plan. How the six hours and the fee fit together is in how to get an evacuation diagram in 6 hours for $89.

What it is not

Three other documents get mixed up with this one.

A building permit set is the pack a building surveyor assesses: floor plans, elevations, sections and the rest of the approval drawings. An evacuation diagram does not replace it.

A liquor redline shows where alcohol may be sold, served or consumed. Liquor Control Victoria describes that plan on Red line plans for licensed areas. Exit arrows do not turn a red line into an evacuation diagram, and a red line on an evacuation diagram does not make it a licensed-area plan. The split is in evacuation diagrams vs redline plans. A standard liquor redline is $499 when usable plans already exist. That fee is a different product.

An NDIS evacuation plan is the diagram used for Specialist Disability Accommodation and Supported Independent Living. It is a separate service: NDIS evacuation plans. A cafe or an office is not that brief. Say which building it is for.

Does your business need one?

We do not decide that. The duty to plan for an emergency sits with the employer, and sometimes with the person who manages the building.

WorkSafe Victoria's office health and safety guidance says employers should prepare for incidents such as fire, and should think about evacuation procedures, floor wardens and practice evacuations. That page names AS 3745-2010, Planning for emergencies in facilities, and notes that the standard recommends an emergency evacuation drill at least annually. WorkSafe's guidance note for smaller organisations asks whether there is a documented site plan showing fire protection equipment, emergency exits and assembly points, and whether that plan is posted where people can see it. The note is Developing a plan for a small organisation.

That is general guidance. It is not a quote of the standard, and it is not a ruling on your premises. AS 3745 is a paid Australian Standard. We use it as layout guidance for the diagram. We do not provide AS 3745 certification. You, or your fire safety adviser, confirm the emergency procedures and that the posted sheet matches the building.

Who usually asks:

  • Offices, when staff and visitors need a sheet at the lift lobby or the tea point
  • Shops and cafes, including the back-of-house, not only the customer floor
  • Warehouses and factories, where the route to an exit is not obvious from the front door
  • Childcare, where the approved provider has emergency and evacuation procedures under the Education and Care Services National Regulations. The provider confirms the diagram suits that plan. We do not make that decision
  • Strata and common property, where an owners corporation or building manager posts a diagram in a lobby or car park. They confirm it matches the building's emergency plan

If nobody has asked, read the WorkSafe pages and check with the person who manages safety for the site before you order a drawing you may not need. If someone has asked, send us the request with the floor plan.

How the diagram is prepared

We draw from a usable floor plan, or from photos that show the layout clearly. If there is nothing reliable to draw from, the first step is a site measurement. That visit has a call-out fee. We do not publish the amount. It is named in the quote before anyone is booked. The six-hour drawing time starts once we can draw, not while we are still waiting to get into the building.

The procedures printed on the sheet are the ones you instruct, set out so a visitor can follow them. A fire safety adviser, if you have one, should confirm those words. We are drafters. We are not the adviser, and we do not approve the emergency plan.

Send the address, the number of floors, and any plan you already have, through fire evacuation plans.

One floor is $89 and each extra floor is $29, delivered in 6 hours when a usable floor plan exists. DWG, PDF and a print-ready PDF.

Upload Your Plans & Get a Quote in 24 Hours

Professional drafting for builders and renovators across Australia. Fixed pricing, fast turnaround.

FAQ

Frequently Asked Questions

Call