How to Get an Evacuation Diagram in 6 Hours for $89
A workplace evacuation diagram does not need a week of drafting when the floor is already drawn. If you can send a usable plan, or photos that show the layout clearly, Arya Designs draws it in 6 hours for $89 on the first floor and $29 for each additional floor. You get a DWG, a PDF and a print-ready PDF. There are no hidden charges on the drawing.
The service page is fire evacuation plans. This note is how the fee and the clock actually work, so the price you read is the price you pay.
The fee
- One floor, including the you-are-here points on that floor: $89
- Each additional floor of the same building: $29
- DWG, PDF and print-ready PDF: included
- A site visit, if there is no usable plan: a call-out fee, quoted before we book. The amount is not published
A single-storey shop is $89. A ground floor and a first floor are $89 plus $29. Three floors are $89 plus $29 for the second floor and $29 for the third. We confirm the number of floors in the quote before we start, and we do not add a fee afterwards for the legend, the procedures block, the file format or the print setup.
A separate building is a separate plan, at $89 for its first floor. A mezzanine that people use is another floor, not a free inset. Tell us about it at the start.
The you-are-here locations on a floor are part of that floor's fee, as long as you list them before we draw. "Lobby" and "rear door" on the ground floor are still the $89 floor. We will not invoice those as extra signs.
When the 6 hours start
The clock starts when we can draw. That is when a usable floor plan is in, or the photos are clear enough to trace the walls, doors and exits, and you have told us the assembly point and the posting locations.
It does not start when an email arrives with no attachment. It does not start while we are waiting for a tenant to unlock a warehouse. If we have to measure the building, the visit is booked first, the call-out fee is in that quote, and the six hours start after the measure is done.
"Usable" means the plan matches the building as it is now. A real-estate marketing plan, a landlord's leasing brochure, or a photo of a faded plan behind the counter is often not that. Send it anyway. We will say, before you pay, whether we can draw from it or whether a measure is required.
What to send
Use the quote form on the fire evacuation plans page, or the contact form. Choose Fire Evacuation Plan as the project type. Include:
- The address, and which floors are in the job
- The floor plan, or photos that show the whole layout, the exits and the fire equipment
- Where you will post the diagram, so the you-are-here markers are right
- The assembly point, in words if you do not have it drawn
- The emergency procedure text, if it has already been written. If it has not, say so and we will set out the steps you instruct. You or your fire safety adviser confirm them
- Any date you need it by, if six hours is tighter or looser than your deadline
You do not need to mark the drawing up. A PDF, a photo of a printed plan, or a DWG are all fine as the source. The files we return are still DWG, PDF and print-ready PDF.
What you get back
- DWG, so the diagram can be edited when a counter moves or a door is added
- PDF, to email to a manager, an insurer or an adviser
- Print-ready PDF, for the wall
Diagrams are prepared to suit AS 3745 layout guidance: the floor, the exits and routes, the fire equipment that is installed, the assembly point, you are here, the procedures and a legend. WorkSafe Victoria's office page names AS 3745-2010 in its emergency-planning notes: Office health and safety. We do not provide AS 3745 certification. The confirmation of the procedures is yours, or your adviser's.
What is not in the $89
The $89 is the drawing. It is not any of these:
- A site measure. That is a call-out, quoted first, with no amount published on the site
- An NDIS evacuation plan for an SDA or SIL home. That is a different service, and it is quoted
- A liquor licence redline. That is $499 when usable plans exist, and it shows the licensed area, not the exits
- A building permit set
- Testing or servicing of extinguishers, hose reels or alarms
- A decision that the law requires you to display a diagram
If you need the redline and the evacuation diagram, say both. They can be drawn from the same floor plan and they stay two sheets. The difference is in evacuation diagrams vs redline plans.
No hidden charges
The published fee is the fee. One floor $89, each extra floor $29, files included, six hours when the plan is usable. If the job is not that job, because the building has to be measured, or because you are actually asking for an NDIS diagram or a liquor redline, we say so before we start and we do not fold that work into the $89.
What the diagram is for is in what a fire evacuation diagram is. What each symbol is doing is in what goes on an evacuation plan.
Send the floor plan through the quote form. One floor is $89, each extra floor is $29, and the files come back in 6 hours when the plan is usable.
Upload Your Plans & Get a Quote in 24 Hours
Professional drafting for builders and renovators across Australia. Fixed pricing, fast turnaround.
