★★★★★ 5.0 on Google · 7 reviews200+ Projects Delivered Across VIC24-Hour Quote TurnaroundFixed Pricing · No Surprises★★★★★ 5.0 on Google · 7 reviews200+ Projects Delivered Across VIC24-Hour Quote TurnaroundFixed Pricing · No Surprises
Back to BlogGuides

Evacuation diagram for a lease or fit-out handover in Melbourne

11 November 2026 8 min read

A lease handover or a fit-out practical completion often includes a line that says "evacuation diagram" or "fire evacuation plan". The person asking may be the landlord, the incoming tenant, the building manager, or the fit-out builder. They usually mean a sheet that can go on the wall of the tenancy as it is now, not the diagram from the tenant who left.

Check the clause or the handover list you were actually sent. We do not decide whether that lease requires a diagram. If it asks for one, this is the drawing. Order it on fire evacuation plans. What each symbol is doing is in what goes on an evacuation plan.

Why the old sheet is usually wrong

The previous diagram was drawn for the previous layout. A Melbourne strip shop, an office suite or a warehouse tenancy rarely hands over with the same counters, partitions and back-of-house as the lease plan from five years ago. Common mismatches:

  • A storeroom was opened into the shop, or a shopfront was moved
  • The rear door the old diagram called an exit now opens into a locked bin room
  • The extinguisher moved from the corridor to the kitchen
  • The assembly point on the old sheet is the landlord's old car park layout
  • The "you are here" marker sits where a wall now is

Handing over that PDF, or photographing the sign still screwed to the wall, does not make it current. If the fit-out changed the path, the diagram has to be drawn again. When to redraw more generally is in how often to update an evacuation diagram.

What to put in the handover pack

Give the incoming tenant or the building manager three files, not a photo of a sign:

  • DWG, so the next fit-out can be updated without tracing a scan
  • PDF, to email with the lease documents
  • Print-ready PDF, for the wall

Those three files are included. One floor is $89. Each extra floor of the same tenancy is $29. A ground-floor shop with a stock mezzanine people use is $89 plus $29. Say so at the start.

With the files, write down:

  1. The address and the tenancy, including the shop number if there is one
  2. Where each diagram will be posted
  3. The assembly point the building already uses, if the manager has one. In a multi-tenant building, do not invent a new footpath if the owners corporation already has a point
  4. Which doors are the exits for this tenancy, including after-hours if the public door is shuttered
  5. The procedure text, if the building has standard wording. If it does not, the tenant or their adviser confirms the words we set out

The six-hour turnaround starts when we can draw from a plan that matches the finished fit-out. The clock, and the longer send list, is in how to get an evacuation diagram in 6 hours for $89. A proposed fit-out drawing is usable only if the tenancy was built that way. If the builder moved a wall on site, send photos or ask for a measure.

If there is no plan of the finished tenancy

A landlord's leasing brochure, a marketing plan, or the architect's tender set from before construction is often not the tenancy you are handing over. The measure comes first: site measurements. What a shop visit needs to capture for a lease or a fit-out is in measuring a Melbourne shop for a lease or fit-out.

The visit has a call-out fee. We do not publish the amount. It is named in the quote before we book. The six hours for the diagram start after that plan exists, not while we are waiting for keys. Laser scanning is available when the tenancy is large or hard to measure with a tape. We do not publish a scan price.

Shops, offices and warehouses

A shop needs the customer floor and the back-of-house on the same sheet, including the exit through the rear lane if that is a real exit. The shopfront door is rarely the only one.

An office suite in a multi-tenant building needs the path from the suite to the building exit the manager nominates, not only the door into the lobby. Common stairs and the assembly point are the building's, unless the brief says otherwise. We draw what you instruct for the tenancy in scope.

A warehouse tenancy needs the exits distinguished from the dock doors, and the assembly point off the truck path. Racking that was installed after the shell plan has to be on the sheet if it changes the route. Occupancy differences for childcare, clinics and warehouses are in evacuation diagrams for childcare, clinics and warehouses.

Diagrams are prepared to suit AS 3745 layout guidance. We do not certify them. You, the building manager, or a fire safety adviser confirm the procedures. If the same tenancy also needs a liquor licence redline, that is a separate sheet: $499 flat, 48 hours, DWG and PDF, when usable plans exist, on redline plans. Exit arrows do not make a red line, and a red line does not make an evacuation diagram.

Send the handover list, the address and the current floor plan through fire evacuation plans. Choose Fire Evacuation Plan on the quote form.

One floor is $89 and each extra floor is $29, in 6 hours when the finished floor plan is usable. You get DWG, PDF and a print-ready PDF.

Upload Your Plans & Get a Quote in 24 Hours

Professional drafting for builders and renovators across Australia. Fixed pricing, fast turnaround.

FAQ

Frequently Asked Questions

Call