★★★★★ 5.0 on Google · 7 reviews200+ Projects Delivered Across VIC24-Hour Quote TurnaroundFixed Pricing · No Surprises★★★★★ 5.0 on Google · 7 reviews200+ Projects Delivered Across VIC24-Hour Quote TurnaroundFixed Pricing · No Surprises
Back to BlogGuides

Planning Permit Drawings in Melbourne: What an Application Usually Needs

17 November 2026 8 min read

A Melbourne planning permit is decided by the local council against the planning scheme. The drawings are what the planner reads. This is the set an application usually needs, and how Arya Designs prepares it.

It is a practical guide, not legal advice. Council requirements vary. A list that is enough in one suburb can be short of what another council asks for once an overlay applies. Nothing on this page is a promise that an application will be approved.

What the drawing set usually includes

Most residential planning applications in Melbourne are built from the same kinds of sheets. The names differ slightly between councils. The job of each sheet does not.

Existing conditions, from a site measure

If the proposal changes a building that is already there, the application usually starts with that building as it stands. An old council plan, a real estate plan, or a sketch is a clue. It is not a measure.

That base is an existing-conditions drawing: walls, openings, levels, and the parts of the site the new work touches. When there is no reliable plan, Arya visits and measures. The service is site measurements in Melbourne. A straightforward house or shop is measured with a laser distance meter and a tape and drawn into CAD. Laser scanning is available when the building is large, multi-level, heritage-detailed, or dense with level changes. We do not publish a price for a scan. The free quote names the method.

Every measure is issued as DWG + PDF. The PDF is the copy you can read and mark up. The DWG is the file the next drawing is traced from. We do not re-establish the title boundary, and we do not prepare a feature and level survey. If the planner has asked for the legal boundary or the contours of the land, that is a licensed land surveyor. We will say so.

What to put in the brief, before anyone draws the new work, is in existing-conditions plans before a Melbourne renovation.

Site plan

The site plan is the property in plan, not the floor layout. A Melbourne application usually expects it to show:

  • The property boundaries, as taken from the title or survey you provide
  • A north point
  • The existing building and the proposed building
  • Setbacks to the boundaries
  • Driveways, crossovers, and the private open space the proposal keeps or changes
  • Significant trees or other features the brief asks us to show

We draw the site plan from the information in the brief and from the building measure. We do not invent a boundary.

Floor plans

Floor plans are the rooms. For an alteration or extension, councils usually want both:

  • Existing floor plans, the rooms as they are
  • Proposed floor plans, the rooms as you want them, with dimensions and room names

A new dwelling is proposed plans, plus whatever existing structures on the lot the council expects to see. More than one storey means a plan of each storey. A single ground-floor plan is not a first-floor addition.

Elevations

Elevations are the outside faces. They show wall heights, the roof, window and door positions, and the materials the planner uses to judge how the proposal meets the street and the neighbours. A two-storey addition, or a house on a slope, usually needs all the faces the new work changes, not a single front view.

Shadow diagrams, where they are relevant

Shadow diagrams are not on every application. They are commonly asked for when a second storey, a roof change, or a wall near a boundary could overshadow a neighbour. Victorian councils often ask for the shadows at 9am, 12pm, and 3pm on 22 September, the equinox. Some overlays ask for more.

If the proposal is a single-storey ground-floor extension with no real overshadowing issue, the council may not ask for them. If you already know the neighbour's sunlight is the planning question, say so in the brief and we include them. If the council asks later, we can add them. We do not treat them as automatic on every job.

Other sheets turn up on some applications and not others: a neighbourhood and site description, overlooking diagrams where upper windows face a neighbour, and a landscape plan on larger developments. The request for further information, if one comes, names what was missing.

What this set is not

Planning permit drawings show the planning proposal. They are not, by themselves, the construction set a builder prices from, and they are not the building permit. A building permit is a later step, assessed by a building surveyor, and it often needs more detail than the planning set.

A markup of a drawing you already have is a different job again. Redline plans cover a liquor licence redline and an architectural revision of an existing set. A liquor licence redline is $499 flat, with a 48-hour turnaround, as DWG + PDF, when usable existing plans already exist. Architectural and council revision redlines are a free quote. A full planning set, for a new extension or a new dwelling, is quoted on its own. The comparison is in redline plan versus full permit drawings.

How Arya prepares the drawings

  1. You send the brief. The address, what you want to change or build, any plans you have, and the council if you know it. Photos of the street and the rear help.
  2. We say if a measure comes first. If the base plan is missing or does not match the building, the site measure is quoted with the job. Laser scanning is recommended only when the building needs it, and it has no published price.
  3. We draw the usual set. Existing conditions where the building is being changed, a site plan, existing and proposed floor plans, and elevations. Shadow diagrams are included when the brief, or the planning issue, needs them.
  4. You receive DWG + PDF. Both files, on every job. The wider reason is in PDF versus DWG.
  5. The council's list can still differ. We prepare the usual Melbourne set and adjust if the council asks for another sheet. We do not decide the application, and we do not guarantee an approval.

The drawing service for that set is approval drawings. Lodging the application and answering the council is a separate scope, on council submissions. How long the council then takes is a different question, covered in how long building approvals take in Victoria.

Council requirements vary

Melbourne is not one checklist. A heritage overlay, a neighbourhood character overlay, a design and development overlay, or a flood or vegetation control can add reports and drawings that a plain residential zone does not. Two houses with the same extension can face different requests because they sit in different councils.

Before you treat this page as the lodgement list, check the planning scheme for the address or ask the council what they want for that proposal. Send us that list with the brief if you have it. If you do not, we start from the usual set and say what we are drawing before we start.

Get a free quote

Send the address and a short description of the change. Tell us if you already have plans. We will say whether the next step is a site measure, a planning drawing set, or a redline of drawings you already have, and we will send a free quote. There is no obligation to go ahead.

Send the address, the council if you know it, and what you want to change. Council requirements vary. The quote is free. Drawings are issued as DWG + PDF.

Upload Your Plans & Get a Quote in 24 Hours

Professional drafting for builders and renovators across Australia. Fixed pricing, fast turnaround.

FAQ

Frequently Asked Questions

Call