Existing-conditions plans before a renovation in Melbourne

11 November 2026 8 min read

A renovation drawing is only as good as the plan of the house it is altering. In Melbourne that plan is often missing, or it shows the house before a closed-in verandah, a 1990s extension, or a kitchen that moved. An existing-conditions plan is the measure of what is there now, drawn so the renovation can be designed from it.

Arya Designs does that measure as a site visit. The service is site measurement in Melbourne. The drawings are issued as DWG and PDF on every job. A call-out fee applies to the visit. We do not publish the amount.

This page is the renovation sequence: what to measure before anyone draws the new work. How long a general site measure takes, and when a laser scan is worth it, is in site measure for existing conditions in Melbourne. What councils and building surveyors expect from as-built drawings on a permit is in as-built drawings for Victorian building permits.

Draw the house before you draw the renovation

The order that avoids redraws is:

  1. Brief the measure. Address, what you intend to change, and which parts of the house are in scope.
  2. Visit and draw the existing conditions. Walls, openings, levels and the rooms the new work touches.
  3. Design the renovation from that file. The proposed plans are a later drawing. They are quoted on their own. A home extension set, once the base exists, is home extension plans.

Skipping the first drawing means the extension is traced over a guess. The guess is usually an old council plan, a real estate plan, or a sketch a previous owner made. Those files are useful as a clue. They are not a measure.

What goes wrong when the base is guessed

The mistakes we see on Melbourne houses are ordinary, and they are expensive once the design is already drawn:

  • A rear extension is not on the plan the designer was given, so the new kitchen is drawn over a wall that is already gone, or into a wall that is still there
  • A closed-in verandah is treated as original house, and the floor level steps in a place the plan shows as flat
  • Window positions are taken from an elevation that does not match the facade, which matters when the new windows face a neighbour
  • Ceiling heights are assumed, then the stair or the bulkhead does not fit
  • A split-level or a garage under the house is left off, and the section is wrong

An existing-conditions plan records the wall that is there. A published example of measuring something that was already built, rather than proposing it, is the as-built verandah documentation in Fitzroy, prepared so the owner could respond to a council building notice. That was a record of the verandah, landing and stair. A renovation measure is the same kind of capture, scoped to the part of the house you are about to change.

What to include for a Melbourne house

Say what the renovation is, so the measure is not the whole property by default and is not missing the one room that matters.

  • Kitchen, bathroom or internal alteration. The rooms in the brief, the walls around them, and the openings. Ceiling height if joinery or a new ceiling is part of the job.
  • Ground-floor extension. The rear or side wall it joins, the existing openings, the floor level, and enough of the yard face to show how the new work meets the house. This is the building. It is not a feature and level survey of the site, and it does not re-establish the title boundary. If the designer has asked for contours or the legal boundary, that is a licensed land surveyor. We will say so. The difference is in measured building survey versus a feature and level survey.
  • First-floor addition. Both levels, the stair, and the roof over the part that changes, if the brief includes it. A single floor plan of the ground floor is not enough.
  • Heritage or older inner suburbs. Terraces and Edwardian houses are often a series of additions. Tell us if the rear wing is in scope. Lane access, if that is how we reach the back, belongs in the brief.

How to write that email, for a house or any other building, is in measured building survey in Melbourne: how to brief one.

What you receive, and how long it takes

You always receive DWG and PDF. The PDF is the set you can mark up with the designer. The DWG is the file they trace. We do not hold the DWG back as an extra. Both files are the job. The reason is in PDF versus DWG.

Before the visit, the free quote names the levels, the sheets, and the timing. A call-out fee applies. The amount is not on this site. It is in that quote.

After the visit, a straightforward house is typically drawn in 1–3 business days. A large house, poor access, or a laser scan takes longer. The quote confirms it. We do not treat that timing as a guaranteed number of days.

Most houses are a traditional measure: a laser distance meter and a tape, drawn into CAD. Laser scanning is available when the house is large, very altered, heritage-detailed, or full of level changes a tape will simplify. We do not publish a scan price. We recommend the method after we see the address and a few photos. The longer comparison is laser scanning versus a traditional site measure.

The existing-conditions plan is not the permit set. It is the base the permit set is drawn from. Send the address and a sentence on what you want to change, through site measurements. Choose Site Measure on the quote form.

Send the address and what you are changing. The quote is free. A call-out fee applies to the visit. You receive DWG and PDF.

Upload Your Plans & Get a Quote in 24 Hours

Professional drafting for builders and renovators across Australia. Fixed pricing, fast turnaround.

FAQ

Frequently Asked Questions

Call